cpChangeOrders
Operator only (is_operator). Paginated change orders, optionally filtered by environment. Returns a *Page (rows/total/page/pageSize); page is 1-based.
cpChangeOrders(
environmentId: String
page: Int! = 1
pageSize: Int! = 50
): CpChangeOrdersPage!
Arguments
cpChangeOrders.environmentId ● String scalar
Environment UUID to filter by. Omit/null for all environments.
cpChangeOrders.page ● Int! non-null scalar
1-based page number (default 1).
cpChangeOrders.pageSize ● Int! non-null scalar
Rows per page (default 50).
Type
CpChangeOrdersPage object
One page of operator change-order rows. Paging is 1-based: page 1 is the first page.