Skip to main content

cpChangeOrders

Operator only (is_operator). Paginated change orders, optionally filtered by environment. Returns a *Page (rows/total/page/pageSize); page is 1-based.

cpChangeOrders(
environmentId: String
page: Int! = 1
pageSize: Int! = 50
): CpChangeOrdersPage!

Arguments

cpChangeOrders.environmentId ● String scalar

Environment UUID to filter by. Omit/null for all environments.

cpChangeOrders.page ● Int! non-null scalar

1-based page number (default 1).

cpChangeOrders.pageSize ● Int! non-null scalar

Rows per page (default 50).

Type

CpChangeOrdersPage object

One page of operator change-order rows. Paging is 1-based: page 1 is the first page.